Hilton decorative elevator cladding

Client:   SIA “LNK Industries”
Place:  Riga, Krogu iela 1
Year of Completion:   2016

The multi-apartment house project was built from "Premium" class "Kivi" blocks. When creating reinforced concrete structures, a vibratory trowel was used in concreting. The foundations of two houses were laid.  Work rate was half of the floor  week.  An entire floor was built in two weeks. As well as covering assembly and concreting works, balcony and column assembly was carried out.